Zwijndrecht: Construction of a permanent jetty for Ineos

Project description :

A new jetty is constructed in Zwijndrecht for the chemical company Ineos: a concrete superstructure will be placed on top of the substructure made out of steel tubular piles, on which the steel tubular bridge can be mounted. At the end of the jetty, a steel truss bridge will be installed.
The following hydraulic structures are required for the jetty: bollards, dolphins and brake rigging.

Client: Ineos

View the showcase !

Contact

Kruibeeksesteenweg 162, 2070 Zwijndrecht

Tel. : 03/250 13 80 - Fax : 03/252 47 95 - Email : hye@hye.be
BTW BE 0404 646 287 - RPR Antwerpen


Made by Wax! Interactive